Bid Solicitation: PW-26-751
Header Information
Bid Number:
PW-26-751
Description:
R-7236 702 W. Anaheim Year-Round Shelter
Bid Opening Date:
07/01/2026 10:00:00 AM
Purchaser:
Jennifer Magajes
Organization:
City of Long Beach
Department:
PW - PUBLIC WORKS
Location:
3007 - CAPITAL IMPROVEMENT PROGRAM
Fiscal Year:
26
Type Code:
05 - RBID - Construction Bid
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
04/16/2026
Available Date :
04/16/2026 07:04:39 AM
Info Contact:
Raquel Tran: Raquel.Tran@longbeach.gov
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Contract
Begin Date:
07/01/2026
End Date:
05/31/2027
Pre Bid Conference:
The additional mandatory Pre-Bid Conference will be conducted at 9:00 a.m. on June 4, 2026, via Microsoft Teams. The mandatory job-site walk-through is at 1:00 p.m. on June 4, 2026. See Addendum 1 for Teams Link.
Bulletin Desc:
The work to be done consists primarily of, but is not limited to, converting the existing space to a year-round shelter with 127 beds along with new HVAC system, restrooms, warming kitchen, dining hall, and offices. Bids are required for the entire Work.
Ship-to Address:
Public Works
411 W Ocean Blvd
Long Beach, CA 90802
US
Email: lbpurchasing@longbeach.gov
Phone: (562) 570-6200
Bill-to Address:
Public Works
411 W Ocean Blvd
Long Beach, CA 90802
US
Email: lbpurchasing@longbeach.gov
Phone: (562) 570-6200
Print Format:
Bid Print
File Attachments:
Seller Guidance v4.pdf
R-7236 702 W Anaheim Year Round Shelter Bid Specification
R-7236 702 W Anaheim Year Round Shelter Bid Plan Set
R-7236 Pre-Bid Meeting Sign-In Sheets
R-7236 Pre-Bid Meeting Presentation
R-7236 Addendum 1
R-7236 2nd Pre-Bid Meeting Sign-In Sheet
R-7236 2nd Pre-Bid Meeting Presentation
R-7236 Addendum 2
R-7236 Revised Bid Specs
R-7236 Addendum 3
PW-26-751 Bid Tab Summary Report
R-7236 Bid Tabulation
New Dynasty Construction Bid Package
PCN3 Inc. Bid Package
PCN3 Inc. Good Faith Effort Documentation
R-7236 Updated Bid Tabulation
New Dynasty Updated Subcontractor List
PCN3 Updated Subcontractor List
R-7236 Revised Updated Bid Tabulation
R-7236 Notice of Intent to Award
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Pre-Bid Meeting:
Yes
Mandatory:
Yes
Pre-Bid Meeting On (PST):
06/04/2026 09:00:00 AM
Pre-Bid Meeting Location:
Microsoft Teams and On-Site at 702 W. Anaheim St. Long Beach, CA 90813
Amendments:
Amendment #
Amendment Date
Amendment Note
1
04/30/2026 09:35:04 AM
Pre-Bid Meeting and Job Walk Through Sign-In Sheets and Presentation Attachment File Changes: Header 1. File 'R-7236 Pre-Bid Meeting Sign-In Sheets': File 'R-7236 Pre-Bid Meeting Sign-In Sheets' added . 2. File 'R-7236 Pre-Bid Meeting Presentation': File 'R-7236 Pre-Bid Meeting Presentation' added .
2
05/20/2026 02:28:51 PM
Addendum 1: R-7236 Updated Plans and Specifications, RFIs, Bid Due Date Extension, Additional Pre-Bid Conference and Job-Site Walk-Through. Header 1. Bid Opening Date changed from "05/28/2026 01:00:00 PM" to "06/25/2026 01:00:00 PM". 2. Pre-Bid Conference changed from "The mandatory Pre-Bid Conference will be conducted at 9:00 a.m. on April 28, 2026, via Microsoft Teams. The mandatory job-site walk-through is at 1:00 p.m. on April 28, 2026, at 702 W. Anaheim St. Long Beach, CA 90813. See Division A." to "The mandatory Pre-Bid Conference will be conducted at 9:00 a.m. on April 28, 2026, via Microsoft Teams. The mandatory job-site walk-through is at 1:00 p.m. on April 28, 2026, at 702 W. Anaheim St. Long Beach, CA 90813. See Division A.". Item 22 1. Description changed from "AB-2: Additive Bid #2 - Dining Room - New warm kitchen, Remove and replace exterior walls and roof, New openings and doors & windows, New lighting & controls, New finishes, New HVAC Sheets: AB-1.0, AB-1.1, AB-2.0, AB-2.1, AB-2.2, AB-3.0, AB-4.0, AB-4.1, SB-0.1, SB-0.2, SB-1.3, SB0-.04, SB-0.5, SB-0.6, SB-2.0, SB-2.1, SB-2.2, SB-3.1, MB-1.0, MB-1.1, MB-2.1, TB-24.0, TB-24.1, EB-1.0, EB-2.0, EB-2.1, EB-3.0, EB-3.1, EB-4.0, EB-4.1, EB-5.0, PB-1.0, PB-1.1, PB-2.0, PB-2.1, PB-3.0, PB-3.1, PB-4.0, PB-4.1" to "AB-2: Additive Bid #2 - Dining Room - New warm kitchen, Remove and replace exterior walls and roof, New openings and doors & windows, New lighting & controls, New finishes, New HVAC. Sheets: AB-1.0, AB-1.1, AB-2.0, AB-2.1, AB-2.2, AB-3.0, AB-4.0, AB-4.1, SB-0.1, SB-0.2, SB-1.3, SB0-.04, SB-0.5, SB-0.6, SB-2.0, SB-2.1, SB-2.2, SB-3.1, MB-1.0, MB-1.1, MB-2.1, TB-24.0, TB-24.1, EB-1.0, EB-2.0, EB-2.1, EB-3.0, EB-3.1, EB-4.0, EB-4.1, EB-5.0, PB-1.0, PB-1.1, PB-2.0, PB-2.1, PB-3.0, PB-3.1, PB-4.0, PB-4.1". Attachment File Changes: Header 1. File 'R-7236 Addendum 1': File 'R-7236 Addendum 1' added .
3
06/03/2026 01:47:59 PM
Additional Mandatory Pre-Bid Conference and Job Site Walk-Through on June 4, 2026. See Addendum 1 for Teams Link. Header 1. Pre-Bid Conference changed from "The mandatory Pre-Bid Conference will be conducted at 9:00 a.m. on April 28, 2026, via Microsoft Teams. The mandatory job-site walk-through is at 1:00 p.m. on April 28, 2026, at 702 W. Anaheim St. Long Beach, CA 90813. See Division A." to "The additional mandatory Pre-Bid Conference will be conducted at 9:00 a.m. on June 4, 2026, via Microsoft Teams. The mandatory job-site walk-through is at 1:00 p.m. on June 4, 2026. See Addendum 1 for Teams Link.". 2. Custom Field: Custom Field changed from "04/28/2026 09:00:00 AM" to "06/04/2026 09:00:00 AM".
4
06/09/2026 08:05:25 AM
2nd Pre-Bid Meeting Sign-In Sheets and Presentation Attachment File Changes: Header 1. File 'R-7236 2nd Pre-Bid Meeting Sign-In Sheet': File 'R-7236 2nd Pre-Bid Meeting Sign-In Sheet' added . 2. File 'R-7236 2nd Pre-Bid Meeting Presentation': File 'R-7236 2nd Pre-Bid Meeting Presentation' added .
5
06/15/2026 01:40:23 PM
Addendum 2: R-7236 RFIs, Bid Due Date Extension, Revised Bid Specs. Header 1. Bid Opening Date changed from "06/25/2026 01:00:00 PM" to "07/01/2026 10:00:00 AM". Item 9 1. NIGP Class Item changed from "45" to "48". 2. UOM changed from "LF" to "LS". 3. Description changed from "Equipment - Ceiling Fans" to "Furnishing". Item 10 1. NIGP Class Item changed from "48" to "00". 2. Description changed from "Furnishings" to "Fire Suppression". Item 11 1. NIGP Class Item changed from "00" to "68". 2. NIGP Class changed from "912" to "914". 3. Description changed from "Fire Suppression" to "Plumbing". Item 12 1. NIGP Class Item changed from "68" to "50". 2. Description changed from "Plumbing" to "Heating, Ventilation, and Air Conditioning". Item 13 1. NIGP Class Item changed from "50" to "38". 2. Description changed from "Heating, Ventilating, and Air Conditioning" to "Electrical". Item 14 1. Description changed from "Electrical" to "Electronic Safety and Security". Item 15 1. NIGP Class Item changed from "38" to "23". 2. NIGP Class changed from "914" to "912". 3. Description changed from "Electronic Safety and Security" to "Earthwork". Item 16 1. NIGP Class Item changed from "23" to "00". 2. NIGP Class changed from "912" to "914". 3. Description changed from "Earthwork" to "Exterior Improvements". Item 17 1. Description changed from "Exterior Improvements" to "Utilities". Item 18 1. Description changed from "Utilities" to "Mobilization/Demobilization (no more than 5% of line items 1-17)". Item 19 1. Description changed from "Mobilization/Demobilization (no more than 5% of line items 1-18)" to "Security Guard". Item 21 1. Description changed from "AB-1: Additive Bid #1 - Sleeping Area - Provide Exterior Envelope Insulation, New Interior Finishes, New Lighting and Controls - New Furniture. Sheets AB-1.0, AB-1.1, AB-2.0, AB-2.1, AB-3.0, AB-4.0, AB-5.0, DB-1.0, EB-1.0, EB-2.0, EB-2.1, EB-3.0, EB-3.1, EV-4.0, EV-4.1, EB-5.0" to "AB-1: Additive Bid #1 - Sleeping Area - Provide Exterior Envelope Insulation, New Interior Finishes, New Lighting and Controls - New Furniture. Sheets AB-1.0, AB-1.1, AB-2.0, AB-2.1, AB-3.0, AB-4.0, AB-5.0, DB-1.0, EB-1.0, EB-2.0, EB-2.1, EB-3.0, EB-3.1, EB-4.0, EB-4.1, EB-5.0". Attachment File Changes: Header 1. File 'R-7236 Addendum 2': File 'R-7236 Addendum 2' added . 2. File 'R-7236 Revised Bid Specs': File 'R-7236 Revised Bid Specs' added .
6
06/25/2026 02:58:54 PM
Addendum 3: R-7236 RFIs, Updated Construction and Demolition Form Attachment File Changes: Header 1. File 'R-7236 Addendum 3': File 'R-7236 Addendum 3' added .
7
07/02/2026 09:55:51 AM
R-7236 Bid Tabulation and Bid Packages Attachment File Changes: Header 1. File 'PCN3 Inc. Bid Package': File 'PCN3 Inc. Bid Package' added . 2. File 'R-7236 Bid Tabulation': File 'R-7236 Bid Tabulation' added . 3. File 'New Dynasty Construction Bid Package': File 'New Dynasty Construction Bid Package' added .
8
07/06/2026 03:00:37 PM
PCN3 Inc. Good Faith Effort Documentation Attachment File Changes: Header 1. File 'PCN3 Inc. Good Faith Effort Documentation': File 'PCN3 Inc. Good Faith Effort Documentation' added .
9
07/16/2026 01:59:09 PM
R-7236 Updated Bid Tabulation and Updated Subcontractor Lists Attachment File Changes: Header 1. File 'New Dynasty Updated Subcontractor List': File 'New Dynasty Updated Subcontractor List' added . 2. File 'R-7236 Updated Bid Tabulation': File 'R-7236 Updated Bid Tabulation' added . 3. File 'PCN3 Updated Subcontractor List': File 'PCN3 Updated Subcontractor List' added .
10
07/16/2026 04:15:30 PM
R-7236 Revised Updated Bid Tabulation Attachment File Changes: Header 1. File 'R-7236 Revised Updated Bid Tabulation': File 'R-7236 Revised Updated Bid Tabulation' added .
11
08/06/2026 08:41:23 AM
R-7236 Notice of Intent to Award Attachment File Changes: Header 1. File 'R-7236 Notice of Intent to Award': File 'R-7236 Notice of Intent to Award' added .
Item Information
1-5 of 26
1
2
3
4
5
6
Item # 1: ( 912 - 40 )
Demolition
NIGP Code:
912-40
Demolition Services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
LS - Lump Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 914 - 30 )
Concrete
NIGP Code:
914-30
Concrete
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
LS - Lump Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 914 - 57 )
Metals
NIGP Code:
914-57
Metal Work
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
LS - Lump Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 4: ( 914 - 31 )
Wood, Plastics, and Composites
NIGP Code:
914-31
Composites
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
LS - Lump Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 5: ( 909 - 84 )
Thermal & Moisture Protection
NIGP Code:
909-84
Thermal and Moisture Protection Services
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
LS - Lump Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
1-5 of 26
1
2
3
4
5
6
Quote #
Description
Date Last Modified
Status