Bid Solicitation: PW-26-787

Header Information

Bid Number: PW-26-787 Description: R-7280 Pacific Avenue Corridor Improvement Project Bid Opening Date: 10/05/2026 12:00:00 PM
Purchaser: Lilia Hom Organization: City of Long Beach
Department: PW - PUBLIC WORKS Location: 3007 - CAPITAL IMPROVEMENT PROGRAM
Fiscal Year: 26 Type Code: 05 - RBID - Construction Bid Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  09/10/2026 06:00:00 AM
Info Contact: Annie Abuana, annie.abuana@longbeach.gov, (562) 570-6342 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Contract
Begin Date: 01/04/2027 End Date: 04/30/2028
Pre Bid Conference: Mandatory pre-bid conference will be held on September 16, 2026, at 3:00 pm via Microsoft Teams. See Division A. Prospective Bidders must attend this virtual meeting. Failure to attend will result in rejection of your bid.
Bulletin Desc: In general, the work comprises without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to construct the PACIFIC AVENUE CORRIDOR IMPROVEMENT PROJECT, No. R-7280
Ship-to Address: Public Works
411 W Ocean Blvd
Long Beach, CA 90802
US
Email: lbpurchasing@longbeach.gov
Phone: (562) 570-6200
Bill-to Address: Public Works
411 W Ocean Blvd
Long Beach, CA 90802
US
Email: lbpurchasing@longbeach.gov
Phone: (562) 570-6200
Print Format: Bid Print
File Attachments: Seller Guidance v4.pdf
R-7280 Pacific Avenue Corridor Improvement Project Plans
R-7280 Pacific Avenue Corridor Improvement Project Specifications
R-7280 Pacific Avenue Corridor Improvements Project - Addendum 1
R-7280 Pacific Avenue Corridor - Pre-Bid Meeting Sign-In Sheet
R-7280 Addendum No. 2 and Q&A
R-7280 Addendum No. 3
PW-26-787 Bid Tab Summary Report
R-7280 Apparent Bid Results 10.5.26
R-7280: Bid Documents Redacted-All American Asphalt
R-7280: Bid Documents Redacted-Sully-Miller Contracting Co
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Pre-Bid Meeting: Yes
Mandatory: Yes
Pre-Bid Meeting On (PST): 09/16/2026 03:00:00 PM
Pre-Bid Meeting Location: Virtual Meeting
Amendments:
Amendment # Amendment Date Amendment Note
1 09/17/2026 05:01:13 PM R-7280 Pacific Avenue Corridor Improvements Project - Addendum 1: Division A, B, H, K. Attachment File Changes: Header 1. File 'R-7280 Pacific Avenue Corridor Improvements Project - Addendum 1': File 'R-7280 Pacific Avenue Corridor Improvements Project - Addendum 1' added .
2 09/21/2026 07:53:25 AM R-7280 Pacific Avenue Corridor - Pre-Bid Meeting Sign-In Sheet Attachment File Changes: Header 1. File 'R-7280 Pacific Avenue Corridor - Pre-Bid Meeting Sign-In Sheet': File 'R-7280 Pacific Avenue Corridor - Pre-Bid Meeting Sign-In Sheet' added .
3 09/28/2026 06:58:48 PM Addendum No. 2: Division B, C, F, I, K, Plans, and Questions & Responses Item 13 1. Quantity changed from "10" to "11.0". Item 19 1. Quantity changed from "18" to "15.0". Item 28 1. Description changed from "CONSTRUCT 6" PCC CURB AND GUTTER PER SPPWC STANDARD PLAN NO. 120-3, TYPE A2-6, W=18"" to "CONSTRUCT 6" PCC CURB AND GUTTER PER SPPWC STANDARD PLAN NO. 120-3, TYPE A2-6, W=24"". Item 32 1. Description changed from "CONSTRUCT 6" THICK PCC DRIVEWAY APPROACH PER CLB STANDARD PLAN NO. 105" to "CONSTRUCT 6" THICK PCC DRIVEWAY OR ALLEY APPROACH PER CLB STANDARD PLAN NO. 105 OR 106". Attachment File Changes: Header 1. File 'R-7280 Addendum No. 2 and Q&A': File 'R-7280 Addendum No. 2 and Q&A' added .
4 09/30/2026 06:31:58 PM Item 14 1. Quantity changed from "13500" to "6700.0". Item 25 1. Description changed from "CONSTRUCT CEMENT TREATED BASE (CTB)" to "CONSTRUCT CEMENT STABILIZED PULVERIZED BASE (CSPB)". Item 78 1. Item 78 added. Attachment File Changes: Header 1. File 'R-7280 Addendum No. 3': File 'R-7280 Addendum No. 3' added .
5 10/05/2026 03:34:20 PM R-7280 Apparent Bid Results & Redacted Bid Documents Attachment File Changes: Header 1. File 'R-7280 Apparent Bid Results 10.5.26': File 'R-7280 Apparent Bid Results 10.5.26' added . 2. File 'R-7280: Bid Documents Redacted-All American Asphalt': File 'R-7280: Bid Documents Redacted-All American Asphalt' added . 3. File 'R-7280: Bid Documents Redacted-Sully-Miller Contracting Co': File 'R-7280: Bid Documents Redacted-Sully-Miller Contracting Co' added .

Item Information

1-5 of 78
1  2  3  4  5  6  7  8  9  10  Next Page Set Last Page
Item # 1:   ( 925  -  00 )   MOBILIZATION & DEMOBILIZATION (5% MAX. OF TOTAL BID)
NIGP Code: 925-00
   ENGINEERING SERVICES, PROFESSIONAL
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 925  -  00 )   CLASS "A" FIELD OFFICE
NIGP Code: 925-00
   ENGINEERING SERVICES, PROFESSIONAL
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 925  -  00 )   SCHEDULING (BASELINE & BI-WEEKLY UPDATES)
NIGP Code: 925-00
   ENGINEERING SERVICES, PROFESSIONAL
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 913  -  81 )   STORMWATER BEST MANAGEMENT PRACTICES (BMP'S)
NIGP Code: 913-81
   Maintenance and Repair, Sewer and Storm Drain, Including Removal
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 968  -  84 )   TRAFFIC CONTROL (EST. 250 WORKING DAYS)
NIGP Code: 968-84
   Traffic Control Services, Including Placement and Removal of Control Devices
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 78