Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: UD-26-361

Time remaining

Header Information

Bid Number: UD-26-361 Description: Cherry Avenue Sewer Improvement Project (SC-0512) Bid Opening Date: 10/14/2026 02:00:00 PM
Purchaser: Wade Depew Organization: Long Beach Utilities Department
Department: ENGINEERING - Engineering Bureau Location: 6006 - Engineering
Fiscal Year: 26 Type Code: 01 - ITB - Invitation to Bid Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  09/18/2026 10:29:51 AM
Info Contact: Contact Matthew Cruz at (562) 570-2332 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Contract
Begin Date: 01/01/2027 End Date: 07/14/2027
Pre Bid Conference: Bidders are encouraged to attend an optional virtual pre-bid meeting at 10 a.m., Tuesday Sept. 29, 2026 and must request an invitation to the meeting by emailing matthew.cruz@lbwater.org with the email subject line: "RSVP-Cherry Ave Sewer Project"
Bulletin Desc: The Work consists of the installation of around 3,100 linear feet of vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line along with 12 new 48-inch sewer maintenance holes and 1 new 60-inch drop sewer maintenance hole. The Work also includes removal and replacement or abandonment of existing sewer lines and manholes. Also included are dewatering, sewer flow bypassing, post-construction video inspection, pavement removal and replacement, trenching, backfilling and compacting.
Ship-to Address: Water Department
1800 E Wardlow Rd
Long Beach, CA 90807
US
Email: Fernando.Eggleston@lbwater.org
Phone: (562) 570-2329
Bill-to Address: Water Department
1800 E Wardlow Rd
Long Beach, CA 90807
US
Email: Fernando.Eggleston@lbwater.org
Phone: (562) 570-2329
Print Format: Bid Print Vendor
File Attachments: Project Specifications
Project Plans
Traffic Control Plan
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Pre-Bid Meeting: Yes
Mandatory: No
Pre-Bid Meeting On (PST): 09/29/2026 10:00:00 AM
Pre-Bid Meeting Location: Online meeting via MS Teams

Item Information

1-5 of 29
1  2  3  4  5  6 
Item # 1:   ( 913  -  45 )   Mobilization and Demobilization
NIGP Code: 913-45
   Construction, Sewer and Storm Drain
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 912  -  44 )   Excavation Safety Measures
NIGP Code: 912-44
   Excavation Services
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 550  -  29 )   Construction Survey Staking and Protecting Existing Monuments
NIGP Code: 550-29
   Markers, Survey and Right-Of-Way
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 968  -  84 )   Traffic Control and Restriping
NIGP Code: 968-84
   Traffic Control Services, Including Placement and Removal of Control Devices
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 968  -  84 )   Traffic Loops Replacement
NIGP Code: 968-84
   Traffic Control Services, Including Placement and Removal of Control Devices
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LS - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 