Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: WD-23-102

Header Information

Bid Number: WD-23-102 Description: Request for Proposal (RFP) to Provide Construction Management and Inspection Services WD-52-22 Bid Opening Date: 07/06/2023 04:00:00 PM
Purchaser: Lauren Fowler Organization: Long Beach Utilities Department
Department: ENGINEERING - Engineering Bureau Location: 6006 - Engineering
Fiscal Year: 23 Type Code: 02 - RFP - Request for Proposal Allow Electronic Quote: Yes
Alternate Id:   Required Date: 07/06/2023 Available Date :  05/22/2023 02:39:28 PM
Info Contact: Contact Ryan Hiney at (562)714-0938 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Contract
Begin Date: 07/06/2023 End Date: 07/20/2023
Pre Bid Conference: A digital pre-proposal meeting will be held on June 15, 2023 at 1:00 p.m. Purpose will be to discuss the scope of work to be performed under the Request for Proposal (RFP).
Bulletin Desc: Request for Proposal to Provide Construction Management and Inspection Services for the Large Water Valve Replacement - Willow Street Project (EO-3598)
Ship-to Address: Water Department
1800 E Wardlow Rd
Long Beach, CA 90807
US
Email: Fernando.Eggleston@lbwater.org
Phone: (562) 570-2329
Bill-to Address: Water Department
1800 E Wardlow Rd
Long Beach, CA 90807
US
Email: Fernando.Eggleston@lbwater.org
Phone: (562) 570-2329
Print Format:
File Attachments: EO-3598 CMS RFP~1.pdf
Exhibit "F": Construction Drawings
Exhibit "G": Project Specifications
PRE-BID MEETING
Questions and Answers
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Pre-Bid Meeting: Yes
Mandatory: No
Pre-Bid Meeting On (PST): 06/15/2023 01:00:00 PM
Pre-Bid Meeting Location: MS Teams https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2YzYzM4Y2MtM2E3OS00MzEwLTg5OGEtZmFlM2Y0ZGE2NmIy%40thread.v2/0?context=%7b%22Tid%22%3a%22313f11c3-4268-4f6a-8d3b-c7e650183e78%22%2c%22Oid%22%3a%22cdec0913-fa94-41df-9f5e-559e01fc5e78%22%7d
Amendments:
Amendment # Amendment Date Amendment Note
1 05/25/2023 03:40:08 PM Item 1 1. Hide Price On Quote Flag changed from "No" to "No". 2. Description changed from "SUBTASK NO 1: PROJECT MANAGEMENT" to "Construction Management and Inspection Services: please see attached". Item 2 1. Item 2 cancelled. Item 3 1. Item 3 cancelled. Item 4 1. Item 4 cancelled. Item 5 1. Item 5 cancelled. Item 6 1. Item 6 cancelled. Item 7 1. Item 7 cancelled. Item 8 1. Item 8 cancelled.
2 06/21/2023 03:32:15 PM Pre-Proposal Meeting Attendance Sheet - WD-23-102 - Willow Large Valve Replacement Attachment File Changes: Header 1. File 'PRE-BID MEETING': File 'PRE-BID MEETING' added .
3 06/29/2023 08:25:15 AM Questions and Answers for CMS RFP of Large Valve Replacement at Willow St (WD-52-22) Attachment File Changes: Header 1. File 'Questions and Answers': File 'Questions and Answers' added .

Item Information

1-5 of 8
1  2 
Item # 1:   ( 925  -  17 )   Construction Management and Inspection Services: please see attached
NIGP Code: 925-17
   Civil Engineering
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 925  -  38 )   SUBTASK NO 2: CONSTRUCTION ENGINEERING SUPPORT
NIGP Code: 925-38
   Field Engineering
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each   Item Canceled
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 968  -  47 )   SUBTASK NO 3: CONSTRUCTION INSPECTION
NIGP Code: 968-47
   Inspection Services, Construction Type
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each   Item Canceled
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 925  -  46 )   SUBTASK NO 4: COORDINATION OF SHUTDOWN AND STARTUP OF FACILITIES
NIGP Code: 925-46
   Geotechnical Engineering
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each   Item Canceled
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 925  -  44 )   SUBTASK NO 5: CONCRETE/GEOTECHNICAL/SOIL TESTING
NIGP Code: 925-44
   General Construction: Management, Scheduling, Cost Estimation Engineering
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each   Item Canceled
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 8
1  2 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status