You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: PW-22-147
Header Information
Bid Number:
PW-22-147
Description:
R-7171 I-605 Soundwall, Coyote Creek to Spring Street
Bid Opening Date:
11/15/2022 01:00:00 PM
Purchaser:
Mark Whitaker
Organization:
City of Long Beach
Department:
PW - PUBLIC WORKS
Location:
3007 - CAPITAL IMPROVEMENT PROGRAM
Fiscal Year:
22
Type Code:
05 - RBID - Construction Bid
Allow Electronic Quote:
Yes
Alternate Id:
R-7171
Required Date:
09/21/2022
Available Date :
09/21/2022 12:00:00 AM
Info Contact:
Romeo Firme at Romeo.firme@longbeach.gov
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Mandatory virtual Pre-bid conference October 25, 2022 at 2:00 pm. See Addendum 2 which modifies Division A, Notice Inviting Bids, for details and meeting link.
Bulletin Desc:
Construct a sound wall on concrete barrier with pile foundation along the NB I-605 edge of shoulder, including replacement of conflicting irrigation lines; installation of two drainage inlets, replacement of two 18-inch corrugated steel pipes for drainage; replacing an existing electrolier with barrier mounted electrolier; relocating roadside signs; installing planting; installing fencing and soundwall with aesthetic treatment.
Ship-to Address:
Public Works
411 W Ocean Blvd
Long Beach, CA 90802
US
Email: lbpurchasing@longbeach.gov
Phone: (562)570-6200
Bill-to Address:
Public Works
411 W Ocean Blvd
Long Beach, CA 90802
US
Email: lbpurchasing@longbeach.gov
Phone: (562)570-6200
Print Format:
Bid Print
File Attachments:
R-7171 I-605 Soundwall, Coyote Creek to Spring Street
Plan Set - Drawing C-6430
Aerially Deposited Lead Report
Electrical As-Builts
Geotechnical Report
NEPA & CEQA Determination
Right of Way Map
R-7171 Addendum 1
R-7171 Addendum 2
R-7171 Addendum 3
R-7171 Pre-Bid Powerpoint Presentation
R-7171 Bid Tab
R-7171 - Powell Bid Package
Form Attachments:
Required Quote Attachments
Desired Attachment Name:  
Division C Documents
Description:  
Upload as one file, except for bid bond.
Desired Attachment Name:  
Bid Bond
Description:  
Bid Bond
Pre-Bid Meeting:
Yes
Mandatory:
Yes
Pre-Bid Meeting On (PST):
10/25/2022 02:00:00 PM
Pre-Bid Meeting Location:
Virtual, see Addendum 2
Amendments:
Amendment #
Amendment Date
Amendment Note
1
09/22/2022 04:25:52 PM
Attachment File Changes: Header 1. File 'Geotechnical Report': File 'Geotechnical Report' added . 2. File 'NEPA & CEQA Determination': File 'NEPA & CEQA Determination' added . 3. File 'Right of Way Map': File 'Right of Way Map' added . 4. File 'Aerially Deposited Lead Report': File 'Aerially Deposited Lead Report' added . 5. File 'Electrical As-Builts': File 'Electrical As-Builts' added .
2
09/27/2022 04:02:56 PM
R-7171 Addendum 1 Attachment File Changes: Header 1. File 'R-7171 Addendum 1': File 'R-7171 Addendum 1' added . Revises Division A, C & E
3
10/17/2022 11:20:49 AM
Header 1. Bid Opening Date changed from "11/04/2022 02:00:00 PM" to "11/15/2022 01:00:00 PM". 2. Pre-Bid Conference changed from "Mandatory Pre-bid conference October 4, 2022 at 1:00 pm. See Division A, Notice Inviting Bids, for details." to "Mandatory virtual Pre-bid conference October 25, 2022 at 2:00 pm. See Addendum 2 which modifies Division A, Notice Inviting Bids, for details and meeting link.". 3. Custom Field: Custom Field changed from "10/04/2022 01:00:00 PM" to "10/25/2022 02:00:00 PM". 4. Custom Field: Custom Field changed from "5th floor" to "Virtual, see Addendum 2". Attachment File Changes: Header 1. File 'R-7171 Addendum 2': File 'R-7171 Addendum 2' added .
4
10/26/2022 08:28:37 AM
Attachment File Changes: Header 1. File 'R-7171 Addendum 3': File 'R-7171 Addendum 3' added . Changes time for completion 2. File 'R-7171 Pre-Bid Powerpoint Presentation': File 'R-7171 Pre-Bid Powerpoint Presentation' added . Pre-bid powerpoint presentation
5
11/16/2022 11:21:55 AM
Bid Tabulation and Powell Constructors Bid Package. Only 1 bid received. Attachment File Changes: Header 1. File 'R-7171 Bid Tab ': File 'R-7171 Bid Tab ' added . 2. File 'R-7171 - Powell Bid Package': File 'R-7171 - Powell Bid Package' added .
Item Information
1-5 of 93
1
2
3
4
5
6
7
8
9
10
Item # 1: ( 912 - 38 )
Lead Compliance Plan
NIGP Code:
912-38
Construction Services, Hazardous Waste, Including Site Management
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
LS - Lump Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 912 - 38 )
Construction Area Signs
NIGP Code:
912-38
Construction Services, Hazardous Waste, Including Site Management
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
LS - Lump Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 968 - 84 )
Traffic Control System
NIGP Code:
968-84
Traffic Control Services, Including Placement and Removal of Control Devices
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
LS - Lump Sum
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 4: ( 912 - 76 )
Temporary Pavement Marking (Paint)
NIGP Code:
912-76
Striping: Streets, Parking Facilities, Lane Divisions, Paint, etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
62.0
SF - Square Foot
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 5: ( 912 - 76 )
Temporary Traffic Striping (Paint)
NIGP Code:
912-76
Striping: Streets, Parking Facilities, Lane Divisions, Paint, etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
11600.0
LF - Linear Foot
Manufacturer:
Brand:
Model:
Make:
Packaging:
1-5 of 93
1
2
3
4
5
6
7
8
9
10
LONGBEACH_LONGBEACH_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status